Skip to content
English - United States
  • There are no suggestions because the search field is empty.

5.6 Is redundancy built into actuator systems critical for energy plants?

The best way to deal with “redundancy” of actuators in critical applications is to have a Spare RACO actuator, same size and configuration, on hand and equip them with the Quick Connect, Plug and Play option.